Commit Graph

8 Commits

Author SHA1 Message Date
Kristoffer Dalby
2b5e52b08b
validate policy against nodes, error if not valid (#2089)
* validate policy against nodes, error if not valid

this commit aims to improve the feedback of "runtime" policy
errors which would only manifest when the rules are compiled to
filter rules with nodes.

this change will in;

file-based mode load the nodes from the db and try to compile the rules on
start up and return an error if they would not work as intended.

database-based mode prevent a new ACL being written to the database if
it does not compile with the current set of node.

Fixes #2073
Fixes #2044

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

* ensure stderr can be used in err checks

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

* test policy set validation

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

* add new integration test to ghaction

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

* add back defer for cli tst

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

---------

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>
2024-08-30 16:58:29 +02:00
Kristoffer Dalby
ac8491efec
Redo DNS configuration (#2034)
this commit changes and streamlines the dns_config into a new
key, dns. It removes a combination of outdates and incompatible
configuration options that made it easy to confuse what headscale
could and could not do, or what to expect from ones configuration.

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>
2024-08-19 11:41:05 +02:00
Kristoffer Dalby
7e62031444
replace ephemeral deletion logic (#2008)
* replace ephemeral deletion logic

this commit replaces the way we remove ephemeral nodes,
currently they are deleted in a loop and we look at last seen
time. This time is now only set when a node disconnects and
there was a bug (#2006) where nodes that had never disconnected
was deleted since they did not have a last seen.

The new logic will start an expiry timer when the node disconnects
and delete the node from the database when the timer is up.

If the node reconnects within the expiry, the timer is cancelled.

Fixes #2006

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

* use uint64 as authekyid and ptr helper in tests

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

* add test db helper

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

* add list ephemeral node func

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

* schedule ephemeral nodes for removal on startup

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

* fix gorm query for postgres

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

* add godoc

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

---------

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>
2024-07-18 10:01:59 +02:00
Pallab Pain
58bd38a609
feat: implements apis for managing headscale policy (#1792) 2024-07-18 07:38:25 +02:00
Kristoffer Dalby
1c6bfc503c
fix preauth key logging in as previous user (#1920)
* add test case to reproduce #1885

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

* fix preauth key issue logging in as wrong user

Fixes #1885

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

* add test to gh

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>

---------

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>
2024-05-02 11:53:16 +02:00
Kristoffer Dalby
58c94d2bd3 Rework map session
This commit restructures the map session in to a struct
holding the state of what is needed during its lifetime.

For streaming sessions, the event loop is structured a
bit differently not hammering the clients with updates
but rather batching them over a short, configurable time
which should significantly improve cpu usage, and potentially
flakyness.

The use of Patch updates has been dialed back a little as
it does not look like its a 100% ready for prime time. Nodes
are now updated with full changes, except for a few things
like online status.

Signed-off-by: Kristoffer Dalby <kristoffer@tailscale.com>
2024-04-15 12:31:53 +02:00
Vitalij Dovhanyc
ef26f58085
update gh workflow actions (#1809) 2024-03-13 13:43:06 +01:00
Vitalij Dovhanyc
e15a08326c
simplify integration testing with matrix jobs (#1799)
* simplify integration testing with matrix jobs

* check if all of the integration tests are in the test-integration workflow
2024-03-02 22:36:38 +01:00