Commit Graph

5 Commits

Author SHA1 Message Date
Tim Möhlmann
9cf67f30b8
fix(milestones): offset the type enum (#8849)
# Which Problems Are Solved

Migration of milestones failed on our QA due to the new milestone Type
enum being 0-indexed. The valid range was 0 till 5, inclusive. While on
the previous zitadel version this was 1 till 6, inclusive.

# How the Problems Are Solved

Offset the first constant with `1`.

# Additional Changes

- none

# Additional Context

Introduced in https://github.com/zitadel/zitadel/pull/8788
2024-10-31 12:03:40 +01:00
Tim Möhlmann
32bad3feb3
perf(milestones): refactor (#8788)
Some checks are pending
ZITADEL CI/CD / core (push) Waiting to run
ZITADEL CI/CD / console (push) Waiting to run
ZITADEL CI/CD / version (push) Waiting to run
ZITADEL CI/CD / compile (push) Blocked by required conditions
ZITADEL CI/CD / core-unit-test (push) Blocked by required conditions
ZITADEL CI/CD / core-integration-test (push) Blocked by required conditions
ZITADEL CI/CD / lint (push) Blocked by required conditions
ZITADEL CI/CD / container (push) Blocked by required conditions
ZITADEL CI/CD / e2e (push) Blocked by required conditions
ZITADEL CI/CD / release (push) Blocked by required conditions
Code Scanning / CodeQL-Build (go) (push) Waiting to run
Code Scanning / CodeQL-Build (javascript) (push) Waiting to run
# Which Problems Are Solved

Milestones used existing events from a number of aggregates. OIDC
session is one of them. We noticed in load-tests that the reduction of
the oidc_session.added event into the milestone projection is a costly
business with payload based conditionals. A milestone is reached once,
but even then we remain subscribed to the OIDC events. This requires the
projections.current_states to be updated continuously.


# How the Problems Are Solved

The milestone creation is refactored to use dedicated events instead.
The command side decides when a milestone is reached and creates the
reached event once for each milestone when required.

# Additional Changes

In order to prevent reached milestones being created twice, a migration
script is provided. When the old `projections.milestones` table exist,
the state is read from there and `v2` milestone aggregate events are
created, with the original reached and pushed dates.

# Additional Context

- Closes https://github.com/zitadel/zitadel/issues/8800
2024-10-28 08:29:34 +00:00
Silvan
17953e9040
fix(setup): init projections (#7194)
Even though this is a feature it's released as fix so that we can back port to earlier revisions.

As reported by multiple users startup of ZITADEL after leaded to downtime and worst case rollbacks to the previously deployed version.

The problem starts rising when there are too many events to process after the start of ZITADEL. The root cause are changes on projections (database tables) which must be recomputed. This PR solves this problem by adding a new step to the setup phase which prefills the projections. The step can be enabled by adding the `--init-projections`-flag to `setup`, `start-from-init` and `start-from-setup`. Setting this flag results in potentially longer duration of the setup phase but reduces the risk of the problems mentioned in the paragraph above.
2024-01-25 17:28:20 +01:00
Silvan
b5564572bc
feat(eventstore): increase parallel write capabilities (#5940)
This implementation increases parallel write capabilities of the eventstore.
Please have a look at the technical advisories: [05](https://zitadel.com/docs/support/advisory/a10005) and  [06](https://zitadel.com/docs/support/advisory/a10006).
The implementation of eventstore.push is rewritten and stored events are migrated to a new table `eventstore.events2`.
If you are using cockroach: make sure that the database user of ZITADEL has `VIEWACTIVITY` grant. This is used to query events.
2023-10-19 12:19:10 +02:00
Elio Bischof
bb756482c7
feat: push telemetry (#6027)
* document analytics config

* rework configuration and docs

* describe HandleActiveInstances better

* describe active instances on quotas better

* only projected events are considered

* cleanup

* describe changes at runtime

* push milestones

* stop tracking events

* calculate and push 4 in 6 milestones

* reduce milestone pushed

* remove docs

* fix scheduled pseudo event projection

* push 5 in 6 milestones

* push 6 in 6 milestones

* ignore client ids

* fix text array contains

* push human readable milestone type

* statement unit tests

* improve dev and db performance

* organize imports

* cleanup

* organize imports

* test projection

* check rows.Err()

* test search query

* pass linting

* review

* test 4 milestones

* simplify milestone by instance ids query

* use type NamespacedCondition

* cleanup

* lint

* lint

* dont overwrite original error

* no opt-in in examples

* cleanup

* prerelease

* enable request headers

* make limit configurable

* review fixes

* only requeue special handlers secondly

* include integration tests

* Revert "include integration tests"

This reverts commit 96db9504ec.

* pass reducers

* test handlers

* fix unit test

* feat: increment version

* lint

* remove prerelease

* fix integration tests
2023-07-06 08:38:13 +02:00