chore(fmt): run gci on complete project
Fix global import formatting in go code by running the `gci` command. This allows us to just use the command directly, instead of fixing the import order manually for the linter, on each PR.
Co-authored-by: Elio Bischof <elio@zitadel.com>
feat(db): wrap BeginTx in spans to get acquire metrics
This changes adds a span around most db.BeginTx calls so we can get tracings about the connection pool acquire process.
This might help us pinpoint why sometimes some query package traces show longer execution times, while this was not reflected on database side execution times.
Co-authored-by: Silvan <silvan.reusser@gmail.com>
* chore: use pgx v5
* chore: update go version
* remove direct pq dependency
* remove unnecessary type
* scan test
* map scanner
* converter
* uint8 number array
* duration
* most unit tests work
* unit tests work
* chore: coverage
* go 1.21
* linting
* int64 gopfertammi
* retry go 1.22
* retry go 1.22
* revert to go v1.21.5
* update go toolchain to 1.21.8
* go 1.21.8
* remove test flag
* go 1.21.5
* linting
* update toolchain
* use correct array
* use correct array
* add byte array
* correct value
* correct error message
* go 1.21 compatible
Even though this is a feature it's released as fix so that we can back port to earlier revisions.
As reported by multiple users startup of ZITADEL after leaded to downtime and worst case rollbacks to the previously deployed version.
The problem starts rising when there are too many events to process after the start of ZITADEL. The root cause are changes on projections (database tables) which must be recomputed. This PR solves this problem by adding a new step to the setup phase which prefills the projections. The step can be enabled by adding the `--init-projections`-flag to `setup`, `start-from-init` and `start-from-setup`. Setting this flag results in potentially longer duration of the setup phase but reduces the risk of the problems mentioned in the paragraph above.
* get key by id and cache them
* userinfo from events for v2 tokens
* improve keyset caching
* concurrent token and client checks
* client and project in single query
* logging and otel
* drop owner_removed column on apps and authN tables
* userinfo and project roles in go routines
* get oidc user info from projections and add actions
* add avatar URL
* some cleanup
* pull oidc work branch
* remove storage from server
* add config flag for experimental introspection
* legacy introspection flag
* drop owner_removed column on user projections
* drop owner_removed column on useer_metadata
* query userinfo unit test
* query introspection client test
* add user_grants to the userinfo query
* handle PAT scopes
* bring triggers back
* test instance keys query
* add userinfo unit tests
* unit test keys
* go mod tidy
* solve some bugs
* fix missing preferred login name
* do not run triggers in go routines, they seem to deadlock
* initialize the trigger handlers late with a sync.OnceValue
* Revert "do not run triggers in go routines, they seem to deadlock"
This reverts commit 2a03da2127.
* add missing translations
* chore: update go version for linting
* pin oidc version
* parse a global time location for query test
* fix linter complains
* upgrade go lint
* fix more linting issues
---------
Co-authored-by: Stefan Benz <46600784+stebenz@users.noreply.github.com>
This implementation increases parallel write capabilities of the eventstore.
Please have a look at the technical advisories: [05](https://zitadel.com/docs/support/advisory/a10005) and [06](https://zitadel.com/docs/support/advisory/a10006).
The implementation of eventstore.push is rewritten and stored events are migrated to a new table `eventstore.events2`.
If you are using cockroach: make sure that the database user of ZITADEL has `VIEWACTIVITY` grant. This is used to query events.